71 checklist items for building applications in Pembroke Pines. Click an item to check it off as you gather your documents.
Check Your Package Free →Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Pembroke Pines building department whether it is due at application or before the first inspection.
Missing notarization = automatic rejection. Three failed review cycles = hold on permit + mandatory meeting with Building Dept, Qualifier, and Design Professional (contact Sbocanegra@cgasolutions.com). After 2nd rejection for same code violation = 20% of permit fee penalty.
Upload your documents and see what is missing against the Pembroke Pines checklist.
Start Free Analysis →3 free analyses to start. No credit card needed.