Hollywood Permit Requirements

Checklists for 21 permit types in Hollywood, plus 59 common rejection reasons. Check your own package against them in seconds.

Check Your Package Free →
21
Permit types
345
Requirements
59
Gotchas
NOC threshold
$5,000 ($15,000 HVAC)
Requirements by permit type
General / Structural
3 types▼
Building Permit
67 items
  • Completed Broward County Uniform Building Permit Application — signed by Property Owner/Agent AND Contractor
  • Letter of Transmittal (Hollywood-specific cover sheet) — required for ALL ePermit submittals
  • Two (2) sets of plans signed and sealed by Florida licensed Architect/Engineer — all documents must be PDF grouped by discipline
  • Current signed/sealed survey and elevation certificate — required for new buildings, structures, additions, and site work
  • Product Approvals (NOAs) — must be reviewed/approved by design professional of record if part of designed plans; NOT required for simple replacement permits
  • + 62 more requirements
View the full building checklist →
Demolition Permit
19 items
  • Completed Broward County Uniform Permit Application from licensed General Contractor
  • SEPARATE Plumbing Permit for sewer and water cap off/removal — provide Plumbing Permit number with this application
  • Broward County Asbestos Program Statement of Responsibilities form
  • Site plan or survey identifying: limits/scope of demolition, existing structure, impervious areas, existing water meter, septic system to be removed — state/show property will be sodded after demolition
  • TECO Gas clearance letter
  • + 14 more requirements
View the full demolition checklist →
Certificate of Occupancy
7 items
  • Certificate of Occupancy/Completion Request Form
  • All final inspections must be passed
  • Final signed/sealed survey and elevation certificate required for new buildings, additions, and site work
  • Energy Building Certification Prior to Final Form
  • FeeCO Residential: 5% of permit fee or $50/unit (greater); CO Commercial: 3% or $50 min; CC: 1-3% depending on issuing entity
  • + 2 more requirements
Roofing
1 types▼
Roofing Permit
23 items
  • Completed Broward County Uniform Building Permit Application (Building checked) from licensed Roofing Contractor or owner-builder
  • Completed High Velocity Hurricane Zone (HVHZ) Uniform Permit Application — provide all attachments listed on instruction page
  • Letter of Transmittal for ePermit submittals
  • Current Miami-Dade Notice of Acceptance (NOA) OR Florida Product Approval for roofing product — all elements identified PLUS Fire Directory listing pages (FBC 1512.3.4, 1516)
  • Broward County Asbestos Program Certificate of Submittal
  • + 18 more requirements
View the full roofing checklist →
Electrical
3 types▼
Electrical Permit
15 items
  • Completed Broward County Uniform Permit Application (Electrical checked) — signed by Owner/Agent and Contractor
  • Letter of Transmittal for ePermit submittals
  • Licensed Electrical Contractor required
  • Contractor's Record Management Form — signed and notarized
  • Certificates of insurance showing 'City of Hollywood, Department of Development Services, 2600 Hollywood Blvd., Hollywood, FL 33020' as certificate holder
  • + 10 more requirements
View the full electrical checklist →
Solar Panel Permit
16 items
  • Completed Broward County Uniform Permit Application from licensed Electrical/Solar Panel Contractor — additional sub-permit applications needed
  • Roof plan — scale drawing showing location of solar panel installation on roof
  • Mandatory Countywide Rooftop Mounted Equipment Affidavit (Board Policy 22-03)
  • Florida Solar Energy Center (FSEC) System Approval Report OR signed/sealed engineered drawings
  • Electrical diagram: PV array configuration, wiring system, overcurrent protection, inverter, disconnect, grounding, AC connection to building
  • + 11 more requirements
View the full solar panel checklist →
Generator Permit
9 items
  • Completed Broward County Uniform Permit Application from licensed contractor
  • Generator specifications and cut sheets
  • Site plan showing location with setbacks
  • If visible from public right-of-way, indicate screening method
  • Electrical plans/riser diagram
  • + 4 more requirements
Plumbing
2 types▼
Plumbing Permit
19 items
  • Completed Broward County Uniform Permit Application (Plumbing checked) — signed by Owner/Agent and Contractor
  • Letter of Transmittal for ePermit submittals
  • Licensed Plumbing Contractor required
  • Certificates of insurance showing 'City of Hollywood, Department of Development Services, 2600 Hollywood Blvd., Hollywood, FL 33020' as certificate holder
  • Plumbing plans showing work location — signed/sealed for complex work
  • + 14 more requirements
View the full plumbing checklist →
Water Heater Permit
9 items
  • Completed Broward County Uniform Permit Application (Plumbing checked) from licensed Plumbing Contractor
  • Broward County Dwelling Unit Water Heater Replacement Data Form (supplement to Broward County Uniform Building Permit Application)
  • Owner-Builder Affidavit if applicable (not for commercial or condos)
  • If tankless water heater: SEPARATE sub-permit application from licensed Electrical Contractor
  • HOA/Condo Association letter if applicable
  • + 4 more requirements
Mechanical / HVAC
1 types▼
Mechanical / HVAC Permit
17 items
  • Completed Broward County Uniform Permit Application (Mechanical checked) — signed by Owner/Agent and Contractor
  • Letter of Transmittal for ePermit submittals
  • Licensed Mechanical Contractor required
  • Certificates of insurance showing 'City of Hollywood, Department of Development Services, 2600 Hollywood Blvd., Hollywood, FL 33020' as certificate holder
  • AHRI Certificate of Product Ratings for A/C equipment being installed
  • + 12 more requirements
View the full mechanical / HVAC checklist →
Windows & Doors
1 types▼
Window & Door Permit
18 items
  • Completed Broward County Uniform Permit Application (Building checked) from licensed Structural Contractor or owner-builder
  • Floor plan showing location, size, and type of product — each numbered to match window/door schedule; include North arrow
  • Current Miami-Dade NOA or Florida Product Approvals — all elements identified via circle or cloud
  • Broward County Uniform Retrofit Window & Door Schedule (effective July 1, 2020)
  • If building mean roof height exceeds 30 feet: site-specific design wind loads for components/cladding signed/sealed by Design Professional; buildings under 30' may use Broward County Fenestration Voluntary Wind Load Chart
  • + 13 more requirements
View the full window & door checklist →
Pool & Spa
1 types▼
Pool & Spa Permit
16 items
  • Completed Broward County Uniform Permit Application (Structural) from licensed contractor
  • SEPARATE Broward County Uniform Permit Applications for EACH sub-permit: Electrical, Mechanical, AND Plumbing — plus any additional applicable work
  • Association approval letter AND Affidavit of Awareness of Homeowners' Association — MUST be submitted even if NOT in an HOA
  • Electronic Digital Signature Affidavit
  • Plans must include: Soil conditions (Geotech Report) or Soil Statement; Occupancy Group; Method of Compliance; Flood Zone BFE & DFE; Materials; Foundation/Column/Beam schedules; Child protection barrier requirements per FBC 450
  • + 11 more requirements
View the full pool & spa checklist →
Fence, Driveway & Structures
3 types▼
Fence Permit
21 items
  • Completed Broward County Uniform Permit Application (Building checked) from licensed Structural Contractor or qualified owner-builder
  • Owner-Builder Disclosure Statement if applicable
  • Survey (clean copy, NO markups) OR site plan showing: location, height, type of fence and gates, linear footage, gate details, material type
  • Survey affidavit if survey is 1-10 years old; surveys over 10 years old NOT accepted — new survey required
  • For fence material OTHER than 6-foot chain link or wood: current NOA or site-specific detail signed/sealed by Design Professional REQUIRED
  • + 16 more requirements
View the full fence checklist →
Driveway Permit
17 items
  • Completed Broward County Uniform Permit Application (Engineering) from licensed Structural Contractor or owner-builder
  • Current signed/sealed property survey — must be less than 1 year old from application date; NO previous markups
  • Survey Affidavit if survey is 1-10 years old (for certain scope of work including driveways)
  • Site plan showing location of existing and/or proposed driveway with proper setbacks, dimensions, and material
  • Homeowner Affidavit — required for stamped concrete and paver driveways
  • + 12 more requirements
View the full driveway checklist →
Shed Permit
13 items
  • Completed Broward County Uniform Permit Application from licensed Structural Contractor or owner-builder
  • If electric in shed: SEPARATE Broward County Uniform Permit Application (Electrical checked) with electrical plan and riser diagram
  • Current Miami-Dade NOA or Florida Product Approval OR construction plans signed/sealed by Design Professional
  • Survey showing location and dimensions of storage shed
  • Survey Affidavit if survey is 1-10 years old
  • + 8 more requirements
View the full shed checklist →
Marine / Waterfront
2 types▼
Dock & Marine Permit
12 items
  • Completed Broward County Uniform Permit Application from licensed General Contractor or Marine Contractor
  • Completed Engineering Permit Application
  • Broward County Environmental Resource General License
  • Contract or Schedule of Values for proposed work
  • Construction plans signed/sealed by Florida licensed engineer
  • + 7 more requirements
View the full dock & marine checklist →
Seawall Permit
12 items
  • Completed Broward County Uniform Permit Application from licensed General Contractor
  • Broward County Environmental Resource General License — required for any activity in, on, or under water or wetlands of Broward County
  • Construction plans signed/sealed by Design Professional — verify seawall meets wind load specifications and framing meets uplift & lateral forces
  • Special Inspector Form signed/sealed by PE/Architect if pile installation utilized
  • Contract or Schedule of Values for proposed work
  • + 7 more requirements
View the full seawall checklist →
Signs
1 types▼
Sign Permit
16 items
  • Completed Broward County Uniform Permit Application from licensed General Contractor
  • If illuminated/electric: SEPARATE Broward County Uniform Permit Application (Electrical checked) from licensed Electrical Contractor
  • Current copy of Certificate of Use
  • Color rendering of proposed sign
  • Survey showing location
  • + 11 more requirements
View the full sign checklist →
Business & Admin
3 types▼
Private Provider
5 items
  • Private Provider — Permit by Affidavit form
  • Plan Review Services: Administrative fee = 72% of standard processing fees (28% reduction)
  • Building Inspection Services: Administrative fee = 84% of standard building permit fees (16% reduction)
  • All standard permit documents still required
  • NotePrivate Provider option allows faster processing at reduced city fees
Change of Contractor
10 items
  • Hold Harmless/Indemnity Letter — per Broward County Administrative Provisions FBC 105.6.4 & 105.6.4.1
  • NEW Broward County Uniform Building Permit Application — must be submitted with Hold Harmless request
  • Amended Notice of Commencement may be required from property owner
  • Proof of notification to previous contractor: notarized letter sent by certified mail WITH receipt, OR notarized letter from previous contractor acknowledging change
  • All supporting documents must be signed and notarized by requesting entity
  • + 5 more requirements
Right-of-Way Permit
4 items
  • Any work done in right-of-way requires SEPARATE Engineering permit application
  • Engineering permit fee: 5% of value of work (minimum $57)
  • Maintenance of Traffic Plan required
  • NoteSeparate ROW Utility Checklist available on forms page
Requirements change. Confirm the current checklist with the Hollywood building department before you submit.

Common rejection reasons in Hollywood

59 documented. Our analysis checks your package against these.

1CLOSED ON FRIDAYS — Building Division hours are Mon-Thu 7am-6pm ONLY
2Insurance certificate must list EXACT wording: 'City of Hollywood, Department of Development Services, 2600 Hollywood Blvd., Hollywood, FL 33020' — AND City must be named as Additional Insured
3Required when the direct contract is greater than $5,000 ($15,000 for repair or replacement of an existing HVAC system), per Fla. Stat. 713.135. Some older city forms list lower figures. Confirm timing with the building department.
430-day plan review period does NOT include Planning, Zoning, Engineering, or Fire review time — actual total can be much longer
5Permit applications become NULL AND VOID after 60 calendar days if no action taken after last review notification
6Owner-Builder cannot sell house/duplex for 1 YEAR after final inspection
7Chain link fencing NOT permitted in RAC district or Historic District; NOT permitted in front yard in TOC district
8PVC fencing NOT permitted in Historic District front yard
9Tree removal permit from Engineering Division required for ALL properties — this catches many contractors off guard
10Landscape sub-permit required for all new construction as addendum to building permit
11All permit applications must be signed AND NOTARIZED — owner-builder must sign/notarize; contractor's notarized signature alone is sufficient if contractor is doing the work
12Express Permitting available ONLY for A/C changeouts and electrical service changes — everything else goes through standard review
13Work without permit = $200 MINIMUM or DOUBLE the permit fee per discipline (contractor); $100 or double (homeowner)
14Expired permit renewal fee is 50% of original calculated building permit fees — NOT a flat fee
15Survey must be current signed/sealed; for certain work types (fence, driveway, patio, shed, etc.) survey affidavit accepted if survey is 1-10 years old; surveys over 10 years NOT accepted
16ePermits submission via email to ePermits@hollywoodfl.org — also use ACCELA portal for express permits
17Letter of Transmittal (cover sheet) REQUIRED for all ePermit submittals — Hollywood-specific form
18Electronic Signature Affidavit required when using digital signatures on plans
19PACO (Pre-Application Conceptual Overview) + TAC (Technical Advisory Committee) approval required for major projects BEFORE applying for Building Permit
20Broward County EPD approval required prior to permit ISSUANCE (not submittal), when applicable
21Broward County Elevator submittal/approval required prior to Building Dept approval, when applicable
22Revisions require Transmittal Form + Architect's Narrative + clouds and deltas — signatures NOT required for corrections
23Roofing: Must submit Broward County Asbestos Program Certificate of Submittal
24Roofing: Re-Roof Mitigation Affidavit AND Mandatory Countywide Rooftop Mounted Affidavit both required
25Roofing: F.S. 553.884 roof-to-wall connection retrofit required if insured value >= $300,000; exemption if cost exceeds 15% of re-roof cost
26Pool: Separate Broward County Uniform Permit Applications required for EACH sub-permit (electrical, mechanical, plumbing)
27Pool: HOA Affidavit of Awareness MUST be submitted even if property is NOT in an HOA
28Pool: Dewatering Affidavit required if applicable — executed and notarized by Contractor AND Owner
29AC: AHRI Certificate of Product Ratings required — not just specs
30AC: Equipment setbacks — 3' side/rear minimum, 12' if adjacent to side street, NOT in front 25' setback
31AC: If visible from public right-of-way, must indicate screening method
32AC: Broward County Uniform Data Form for Residential/Light Commercial AC Replacements required
33Demolition: Separate Plumbing Permit required for sewer/water cap off — provide plumbing permit number with demo application
34Demolition: Must submit letters from ALL utilities (power, gas, cable, phone) proving disconnection — even if not currently in service
35Demolition: TECO Gas clearance letter + FPL power disconnect letter required
36Demolition: Mechanical permit required to remove A/C units
37Demolition: Erosion and sedimentation control plan required showing silt fencing, dust remediation, stormwater protection
38Demolition: Must state/show on plans that property will be sodded after demolition
39Fence: NOA or site-specific engineer detail required for ANY fence material other than 6-foot chain link or wood
40Fence: If pool exists within fence limits, must comply with Residential Swimming Pool Safety Act
41Solar: TWO contractor types involved — EC (electrical) needs CCC (roofing) sub-permit for attachment; CVC (solar) needs EC for electrical but NOT CCC for attachment
42Solar: Mandatory Countywide Rooftop Mounted Equipment Affidavit required
43Solar: FSEC System Approval Report OR signed/sealed engineered drawings required
44Solar: Roof Warranty Acknowledgment letter must be signed by BOTH Owner and Contractor
45Solar: Battery backup systems require fire detection and interconnected smoke alarms throughout dwelling and garage
46Driveway: Survey must be less than 1 year old (affidavit available for 1-10 year surveys); NO markups on survey
47Driveway: 20% of front yard area must remain landscaped open space
48Driveway: Curb cut cannot exceed 30% of lot width (smaller lots may have max 18' curb cut even if > 30%)
49Driveway: Homeowner Affidavit required for stamped concrete and paver driveways
50Driveway: Historic District requires board approval for new circular driveways; must use semi-pervious material
51Window/Door: Broward County Uniform Retrofit Window & Door Schedule required
52Window/Door: CCCL properties facing East/North/South near beach must submit Turtle glass VLT certification (VLT >= 45)
53Window/Door: Historic District — no change to size, shape, or location of openings without Planning (Historic) review
54Sign: Certificate of Use required with application
55Sign: Knox box and Fire review required for commercial signs
56Sign: Sign tag required on installed sign with permit number, date, contractor name, property address
57Change of Contractor: Requires new Broward County Uniform Building Permit Application + Hold Harmless/Indemnity Letter + proof of notification to previous contractor (notarized letter or certified mail receipt)
58Historic District properties have additional regulations for roofing, fencing, driveways, windows/doors, AC placement, and sheds
59Shed: Max one per property, max 200 sq ft (10x20), not in front yard, 5' rear/side setback (0' if adjacent to alley)
Frequently asked questions
Do I need a Notice of Commencement in Hollywood?

Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Hollywood building department whether it is due at application or before the first inspection.

What are common reasons permits get rejected in Hollywood?

CLOSED ON FRIDAYS — Building Division hours are Mon-Thu 7am-6pm ONLY. Insurance certificate must list EXACT wording: 'City of Hollywood, Department of Development Services, 2600 Hollywood Blvd., Hollywood, FL 33020' — AND City must be named as Additional Insured. Required when the direct contract is greater than $5,000 ($15,000 for repair or replacement of an existing HVAC system), per Fla. Stat. 713.135. Some older city forms list lower figures. Confirm timing with the building department.

Check your Hollywood package.

Upload your documents and see what is missing before you submit.

Start Free Analysis →

3 free analyses to start. No credit card needed.

Free
$0
3 analyses to start
Pro
$49/mo
20 analyses/month
Unlimited
$149/mo
Unlimited analyses
Single
$15.99
One time
Nearby cities
All Broward County cities →