Checklists for 29 permit types in Davie, plus 14 common rejection reasons. Check your own package against them in seconds.
14 documented. Our analysis checks your package against these.
Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Davie building department whether it is due at application or before the first inspection.
2 paper sets if submitting paper plans, or submit electronically via OAS/ProjectDox.
Yes. Davie is in the HVHZ, which affects product approval and wind load requirements.
CLOSED FRIDAYS — Town of Davie operates Monday-Thursday only (7:30 AM - 5:30 PM); do not attempt to schedule inspections or visit on Fridays. NOC must be POSTED at job site for first inspection (7 days after permit issued) — if not posted, inspection fails and $75 re-inspection fee is charged. Inspection cancellation cutoff is 8:30 AM — cancellations after 8:30 AM may result in additional fees on the permit.
Upload your documents and see what is missing before you submit.
Start Free Analysis →3 free analyses to start. No credit card needed.