Sunrise Permit Requirements

We check your documents against every Sunrise-specific requirement. Instantly.

0
Permit Types
0
Requirements
0
Gotchas
Check Your Sunrise Package →

Building Department

Address
10770 W. Oakland Park Boulevard, Sunrise, FL 33351
Hours
Mon–Thu 8:00 AM to 5:00 PM, Fri 8:00 AM to 4:00 PM
Submission
e-Plan Review online + in-person; SIGNED ZONING CHECKLIST REQUIRED — applications rejected without it
NOC Threshold
$5000 — NOC required above this amount
Plan Sets
2 set(s) required
Wind Zone
HVHZ — All exterior products need Miami-Dade NOA or FL# approval
Open Sunrise Permit Portal →

Permit Types by Trade

Click any trade to expand. These are the 261 requirements we check.

General / Structural3

General Construction / Building Permit — City of Sunrise

54
  • Hours: Mon–Thu 8 AM – 5 PM, Fri 8 AM – 4 PM
  • Professional Day: Every Wednesday 8 AM – Noon (Plans Examiners available for walk-in Q&A)
  • Sunrise Building Permit Application Cover Sheet — SUNRISE-SPECIFIC city cover sheet required
  • + 51 more checked during analysis

Screen Enclosure Permit — City of Sunrise

15
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Product Approvals (NOAs) for screen enclosure system
  • Plans and survey
  • Contractor license and insurance
  • + 11 more checked during analysis

Demolition Permit — City of Sunrise

8
  • City of Sunrise applicable Addendums
  • Broward County Asbestos Renovation or Demolition Form (SRRA) — REQUIRED
  • Two (2) sets of plans/scope of work
  • Survey
  • + 4 more checked during analysis
Roofing1

Roof / Re-Roof Permit — City of Sunrise

17
  • Two (2) sets of complete HVHZ uniform roofing permit application form and all attachments
  • HVHZ Required Owners Notification for Roofing Considerations — owner initials required
  • + 15 more checked during analysis
Electrical2

Electrical Permit — City of Sunrise

21
  • Sunrise Building Permit Application Cover Sheet
  • Building Permit Addendum — Electrical (SUNRISE-SPECIFIC)
  • Two (2) sets of plans signed and sealed — or notarized by Electrical Contractor qualifier
  • Product Approvals (NOAs) as applicable
  • + 17 more checked during analysis

Generator Permit — City of Sunrise

6
  • Broward County Uniform Building Permit Application + City of Sunrise Electrical Addendum
  • Product approvals
  • Plans showing installation location and details
  • Generator (residential) fee: $333.66 total ($111.22 app + $222.44 remaining)
  • + 2 more checked during analysis
Plumbing1

Plumbing Permit — City of Sunrise

19
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application (Plumbing checked)
  • Building Permit Addendum — Plumbing (SUNRISE-SPECIFIC)
  • Two (2) sets of plans (signed and sealed when required by code)
  • + 15 more checked during analysis
Mechanical / HVAC1

Mechanical / AC Permit — City of Sunrise

16
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application (Mechanical checked)
  • Building Permit Addendum — Mechanical (SUNRISE-SPECIFIC)
  • Contractor license and insurance (current) — registrations expire Sept 30 annually
  • + 12 more checked during analysis
Windows & Doors1

Windows & Doors / Shutters Permit — City of Sunrise

10
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Product Approvals (NOAs) — required for ALL window, door, and shutter products in HVHZ
  • Broward County Retrofit Window and Door Schedule — available from Document Central
  • Broward County Fenestration Wind Load Chart — available from Document Central
  • + 6 more checked during analysis
Pool & Spa1

Pool / Spa / Fountain Permit — City of Sunrise

18
  • City of Sunrise Structural Addendum
  • Pool plans designed by FL registered Architect or Professional Engineer
  • + 16 more checked during analysis
Fence & Driveway2

Fence Permit — City of Sunrise

23
  • Completed Homeowner Affidavit
  • Two (2) copies of boundary survey or site plan indicating fence location and dimensions
  • Mark each run of fence with X's, label each run with length, indicate gate locations and sizes
  • State if pool and/or spa is on property
  • + 19 more checked during analysis

Shed Permit — City of Sunrise

12
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Plans and product approvals as applicable
  • Survey showing proposed location
  • Contractor license and insurance
  • + 8 more checked during analysis
Marine / Waterfront1

Dock Permit — City of Sunrise

14
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application + Structural Addendum
  • Signed and sealed plans + calculations by FL licensed Architect/Engineer
  • Survey — current, signed and sealed, showing existing conditions
  • + 10 more checked during analysis
Fire & Safety1

Fire Suppression / Alarm Permit — City of Sunrise

7
  • Broward County Uniform Building Permit Application + City of Sunrise Fire Addendum
  • Fire sprinkler/alarm drawings — signed and sealed sprinkler drawing and hydraulic calcs
  • Cut sheets for ALL components used
  • Fire suppression system fee: $337.93 total ($112.64 app + $225.29 remaining)
  • + 3 more checked during analysis
Signs1

Sign Permit — City of Sunrise

8
  • Broward County Uniform Building Permit Application + applicable addendums
  • Product Approvals (NOAs) for sign structure
  • Plans (signed and sealed for monument signs)
  • Contractor license and insurance
  • + 4 more checked during analysis
Business & Admin2

Private Provider — City of Sunrise

7
  • Notice to Building Official of Use of Private Provider — Form # 61G20-2.005-2002-01 (effective January 1, 2025)
  • Services: Plans Review, Inspections, or both
  • Must include: qualification statements/resumes + certificate of insurance per s. 553.791(18)
  • + 4 more checked during analysis

Change of Contractor — City of Sunrise

6
  • City of Sunrise Hold Harmless/Indemnity Letter — available in Document Central
  • Form must be completely filled out, signed, and NOTARIZED
  • New Broward County Uniform Building Permit Application + City of Sunrise Addendum
  • Amended Notice of Commencement
  • + 2 more checked during analysis

Common Rejection Reasons

Top 8 reasons permits get rejected in Sunrise.

1
Signed Zoning Checklist is REQUIRED with every permit application — applications are rejected without it. This is a SUNRISE-SPECIFIC requirement not found in other Broward cities.
2
Demos, additions, alterations, and new construction must be approved by BROWARD COUNTY ePERMITS FIRST, THEN submitted to Sunrise Community Development for exterior changes, THEN to Building Division. Three-step routing.
3
Contractor registrations expire SEPTEMBER 30TH every year — NOT on the anniversary of registration. Must re-register before Oct 1 or cannot pull permits.
4
Insurance certificate holder must read EXACTLY 'City of Sunrise, 10770 W. Oakland Park Boulevard, Sunrise, FL 33351' — any variation (wrong street format, missing city name) will delay registration.
5
Qualifier's government-issued photo ID is required for contractor registration — most cities don't require this. Missing ID = registration rejected.
6
Contractor Registration form must be NOTARIZED by the qualifying agent — unsigned or un-notarized forms rejected.
7
Owner Builder Affidavit MUST be signed IN PERSON at the Building Division and notarized by a City of Sunrise Permit Service Specialist. Cannot be done remotely, even for electronic submittals.
8
NOC threshold discrepancy — Alliance page and some older forms say $2,500 but current F.S. 713.13 (eff. 7/1/2024) sets threshold at $5,000. Newer 2025 checklists reflect $5,000. Use $5,000.

See What You Get

This is what a Flo Permit analysis looks like:

Analysis Complete
Sunrise · Roofing Permit
73%
Compliance
×Roof Material WorksheetMissing
×Product Approval (FL# or NOA)Missing
Signed & Sealed PlansFound
Permit ApplicationFound
Notice of CommencementFound
Product approvals must show FL approval number or Miami-Dade NOA — generic spec sheets will be rejected.
Try With Your Documents →
Free
$0
1 analysis/month
Pro
$29/mo
30 analyses/month
Single
$15.99
One-time analysis

FAQ — Sunrise

What documents do I need for a permit in Sunrise?

For most permits: completed application, signed & sealed plans, site survey, product approvals (Miami-Dade NOA or FL# required since Sunrise is HVHZ), energy calculations for HVAC, and Notice of Commencement if your job exceeds $5000. Our AI checks your package against all 261 Sunrise-specific requirements and shows you exactly what's missing.

How do I submit a permit in Sunrise?

e-Plan Review online + in-person; SIGNED ZONING CHECKLIST REQUIRED — applications rejected without it Access the portal: Sunrise online permitting system. Phone: 954-572-2354

What are the most common reasons permits get rejected in Sunrise?

Based on 24 documented gotchas: Signed Zoning Checklist is REQUIRED with every permit application — applications are rejected without it. This is a SUNR... Our AI automatically flags all 24 known rejection triggers for Sunrise before you submit.

Is Sunrise in the HVHZ?

Yes — Sunrise is in a High Velocity Hurricane Zone. Every exterior product (windows, doors, roofing, shutters) must have a Miami-Dade NOA or Florida Product Approval with FL# number. Standard ICC-ES reports or generic spec sheets are NOT accepted. Our AI verifies product approval documentation automatically.