Broward County

Sunrise Permit Requirements

Checklists for 17 permit types in Sunrise, plus 23 common rejection reasons. Check your own package against them in seconds.

Check Your Package Free →
17
Permit types
278
Requirements
23
Gotchas
Phone
954-572-2354
Address
10770 W. Oakland Park Boulevard, Sunrise, FL 33351
Hours
Mon–Thu 8:00 AM to 5:00 PM, Fri 8:00 AM to 4:00 PM
Portal
Plan sets
2 sets
NOC threshold
$5,000 ($15,000 HVAC)
Wind zone
HVHZ (High Velocity)
Requirements by permit type
General / Structural
3 types▼
Building Permit
61 items
  • Submit permit application through Customer Self Service Portal at sunrisefl.gov/openforbusiness OR in person at 10770 W. Oakland Park Blvd, Sunrise, FL 33351
  • GotchaALL permit applications must FIRST be submitted to Sunrise Zoning — Signed Zoning Checklist is REQUIRED or application is REJECTED
  • GotchaDemos, additions, alterations, new construction must be approved by Broward County ePermits FIRST (broward.org/epermits), then Sunrise Community Development for exterior changes, THEN Building Division
  • Re-roofing, interior renovations, fencing, interior plumbing/electrical, AC changeouts go DIRECTLY to Building Division — no Planning review needed
  • Hours: Mon–Thu 8 AM – 5 PM, Fri 8 AM – 4 PM
  • + 56 more requirements
View the full building checklist →
Demolition Permit
8 items
  • GotchaMust be approved by Broward County ePermits FIRST — demo is in the routing category that requires county approval before city submittal
  • Broward County Uniform Building Permit Application — separate applications for each discipline: Structural, Mechanical, Electrical, Plumbing (each $166.83 total)
  • City of Sunrise applicable Addendums
  • Broward County Asbestos Renovation or Demolition Form (SRRA) — REQUIRED
  • Two (2) sets of plans/scope of work
  • + 3 more requirements
Screen Enclosure Permit
14 items
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Product Approvals (NOAs) for screen enclosure system
  • Plans and survey
  • Contractor license and insurance
  • Notice of Commencement — job value > $5,000
  • + 9 more requirements
View the full screen enclosure checklist →
Roofing
1 types▼
Roofing Permit
18 items
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum — completely filled out including job description, total value, and all contact emails
  • GotchaHVHZ Uniform Roof Permit Application — MUST use 8th Edition (FBC 2023). Sunrise has both 7th and 8th edition forms; 8th Edition REQUIRED for all current submittals.
  • Roof/Reroof Replacement Application Checklist — SUNRISE-SPECIFIC city-specific checklist form that must be completed and included
  • Two (2) sets of complete HVHZ uniform roofing permit application form and all attachments
  • Product Approvals (NOAs) for ALL roof products — signed by designer of record. May be Florida Product Approvals or Miami-Dade NOAs. Must include roof covering materials AND any products installed on roof (attic vents, skylights, etc.)
  • + 13 more requirements
View the full roofing checklist →
Electrical
2 types▼
Electrical Permit
22 items
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application (Electrical checked) — completely filled out, signed by qualifier, notarized
  • Building Permit Addendum — Electrical (SUNRISE-SPECIFIC)
  • Two (2) sets of plans signed and sealed — or notarized by Electrical Contractor qualifier
  • Product Approvals (NOAs) as applicable
  • + 17 more requirements
View the full electrical checklist →
Generator Permit
6 items
  • Broward County Uniform Building Permit Application + City of Sunrise Electrical Addendum
  • Product approvals
  • Plans showing installation location and details
  • Generator (residential) fee: $333.66 total ($111.22 app + $222.44 remaining)
  • Contractor license and insurance
  • + 1 more requirements
Plumbing
1 types▼
Plumbing Permit
20 items
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application (Plumbing checked)
  • Building Permit Addendum — Plumbing (SUNRISE-SPECIFIC)
  • Two (2) sets of plans (signed and sealed when required by code)
  • Contractor license and insurance (current) — registrations expire Sept 30 annually
  • + 15 more requirements
View the full plumbing checklist →
Mechanical / HVAC
1 types▼
Mechanical / HVAC Permit
18 items
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application (Mechanical checked)
  • Building Permit Addendum — Mechanical (SUNRISE-SPECIFIC)
  • Contractor license and insurance (current) — registrations expire Sept 30 annually
  • GotchaInsurance cert holder must read EXACTLY: 'City of Sunrise, 10770 W. Oakland Park Boulevard, Sunrise, FL 33351'
  • + 13 more requirements
View the full mechanical / HVAC checklist →
Windows & Doors
1 types▼
Window & Door Permit
11 items
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Product Approvals (NOAs) — required for ALL window, door, and shutter products in HVHZ
  • Broward County Retrofit Window and Door Schedule — available from Document Central
  • Broward County Fenestration Wind Load Chart — available from Document Central
  • Contractor license and insurance (current)
  • + 6 more requirements
Pool & Spa
1 types▼
Pool & Spa Permit
19 items
  • GotchaTHREE separate Broward County Uniform Building Permit Applications required — Structural + Electrical + Plumbing (each completely filled out, signed by qualifier, notarized)
  • City of Sunrise Structural Addendum
  • Pool plans designed by FL registered Architect or Professional Engineer
  • Survey — showing all property lines, existing fences, current structures, utility easements, drainage easements (if not included in construction drawings)
  • Electrical documents/specifications — spec sheets for all equipment; include exit alarm specs for windows/doors if applicable
  • + 14 more requirements
View the full pool & spa checklist →
Fence, Driveway & Structures
2 types▼
Fence Permit
25 items
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum — completely filled out including fence type, height, and total length
  • GotchaMust call U.N.C.L.E. at 1-800-432-4770 for ticket number — include on application
  • Completed Homeowner Affidavit
  • Two (2) copies of boundary survey or site plan indicating fence location and dimensions
  • Mark each run of fence with X's, label each run with length, indicate gate locations and sizes
  • + 20 more requirements
View the full fence checklist →
Shed Permit
12 items
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Plans and product approvals as applicable
  • Survey showing proposed location
  • Contractor license and insurance
  • Notice of Commencement — job value > $5,000
  • + 7 more requirements
View the full shed checklist →
Marine / Waterfront
1 types▼
Dock & Marine Permit
14 items
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application + Structural Addendum
  • Signed and sealed plans + calculations by FL licensed Architect/Engineer
  • Survey — current, signed and sealed, showing existing conditions
  • Special Inspector Form (FBC 8th Edition) — available in Document Central
  • + 9 more requirements
View the full dock & marine checklist →
Fire & Safety
1 types▼
Fire Sprinkler & Alarm Permit
7 items
  • Broward County Uniform Building Permit Application + City of Sunrise Fire Addendum
  • Fire sprinkler/alarm drawings — signed and sealed sprinkler drawing and hydraulic calcs
  • Cut sheets for ALL components used
  • Fire suppression system fee: $337.93 total ($112.64 app + $225.29 remaining)
  • Duct detector test: $222.45 total + $51.33 each additional duct detector
  • + 2 more requirements
Signs
1 types▼
Sign Permit
8 items
  • Broward County Uniform Building Permit Application + applicable addendums
  • Product Approvals (NOAs) for sign structure
  • Plans (signed and sealed for monument signs)
  • Contractor license and insurance
  • NoteSunrise has active Sign Regulations Update — check sunrisefl.gov for current regulations
  • + 3 more requirements
Business & Admin
2 types▼
Private Provider
7 items
  • Notice to Building Official of Use of Private Provider — Form # 61G20-2.005-2002-01 (effective January 1, 2025)
  • Services: Plans Review, Inspections, or both
  • NoteIf fee owner elects private provider for plans review, Building Official may require private provider for inspections as well (per s. 553.791(2)(a))
  • Must include: qualification statements/resumes + certificate of insurance per s. 553.791(18)
  • Private provider reviews limited to building code compliance — does NOT include fire prevention, fire safety, land use, environmental reviews
  • + 2 more requirements
Change of Contractor
8 items
  • City of Sunrise Hold Harmless/Indemnity Letter — available in Document Central
  • Form must be completely filled out, signed, and NOTARIZED
  • New Broward County Uniform Building Permit Application + City of Sunrise Addendum
  • Amended Notice of Commencement
  • Fee$114.07 per discipline
  • + 3 more requirements
Requirements change. Confirm the current checklist with the Sunrise building department before you submit.

Common rejection reasons in Sunrise

23 documented. Our analysis checks your package against these.

1Signed Zoning Checklist is REQUIRED with every permit application — applications are rejected without it. This is a SUNRISE-SPECIFIC requirement not found in other Broward cities.
2Demos, additions, alterations, and new construction must be approved by BROWARD COUNTY ePERMITS FIRST, THEN submitted to Sunrise Community Development for exterior changes, THEN to Building Division. Three-step routing.
3Contractor registrations expire SEPTEMBER 30TH every year — NOT on the anniversary of registration. Must re-register before Oct 1 or cannot pull permits.
4Insurance certificate holder must read EXACTLY 'City of Sunrise, 10770 W. Oakland Park Boulevard, Sunrise, FL 33351' — any variation (wrong street format, missing city name) will delay registration.
5Qualifier's government-issued photo ID is required for contractor registration — most cities don't require this. Missing ID = registration rejected.
6Contractor Registration form must be NOTARIZED by the qualifying agent — unsigned or un-notarized forms rejected.
7Owner Builder Affidavit MUST be signed IN PERSON at the Building Division and notarized by a City of Sunrise Permit Service Specialist. Cannot be done remotely, even for electronic submittals.
8Required when the direct contract is greater than $5,000 ($15,000 for repair or replacement of an existing HVAC system), per Fla. Stat. 713.135. Some older city forms list lower figures. Confirm timing with the building department.
9Sunrise requires SEPARATE addendums for each trade (Structural, Electrical, Mechanical, Plumbing, Fire) IN ADDITION to the Broward County Uniform Application. Missing an addendum = application rejected.
10Change of Contractor requires a NOTARIZED Hold Harmless/Indemnity Letter, a NEW permit application, AND an amended NOC. Fee is $114.07 per discipline. If changing prime contractor, owner signs. If changing sub, BOTH owner and prime contractor must file separate Hold Harmless letters.
11Pool permits require THREE separate Broward County Uniform Applications (Structural + Electrical + Plumbing) — not just one.
12Pool Safety Act form must be NOTARIZED — signed by both owner and prime contractor.
13Solar PV requires a Rooftop Solar Panel Owner Acknowledgement Form — SUNRISE-SPECIFIC form signed by property owner.
14Solar licensing trap — Solar Contractor (CVC) can do work up to inverter/optimizer only. EC license required for work after power conditioner. CBC/CRC/CGC licenses CANNOT pull solar PV permits.
15Fence applications require U.N.C.L.E. ticket number (call 1-800-432-4770) — must be included on application. Also requires Homeowner Affidavit.
16Stockade fences / board-on-board fences are PROHIBITED in Sunrise. Chain link fences MUST be vinyl coated.
17Garage-to-room conversions are PROHIBITED in Sunrise — cannot convert a single family garage into habitable space.
18Driveways require an ENGINEERING permit (not a building permit) — different department, different division, different address (1601 NW 136th Ave, Building A, Sunrise, FL 33323).
19Permit revision requires a new permit application for EACH affected contractor/subcontractor — not just a markup.
20Sunrise does NOT offer expedited review — no fast-track option available.
21Roofing — both 7th and 8th Edition HVHZ Uniform Roof Applications are available on the website, but you MUST use the 8th Edition (FBC 2023) for current submittals.
22AC Replacement — Owner-builder limited to DUCTWORK AND VENTILATION ONLY. Cannot self-permit the mechanical equipment replacement.
23Screen enclosures with SOLID ROOFS typically require 20ft rear setback (vs 5ft for screen roof). This catches many homeowners.
Frequently asked questions
Where do I submit a permit application in Sunrise?

e-Plan Review online + in-person; SIGNED ZONING CHECKLIST REQUIRED — applications rejected without it. Portal: https://sunrisefl.gov/openforbusiness.

Do I need a Notice of Commencement in Sunrise?

Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Sunrise building department whether it is due at application or before the first inspection.

How many plan sets does Sunrise require?

2 sets listed. This can vary by permit type, so confirm with the building department.

Is Sunrise in the High Velocity Hurricane Zone (HVHZ)?

Yes. Sunrise is in the HVHZ, which affects product approval and wind load requirements.

What are common reasons permits get rejected in Sunrise?

Signed Zoning Checklist is REQUIRED with every permit application — applications are rejected without it. This is a SUNRISE-SPECIFIC requirement not found in other Broward cities. Demos, additions, alterations, and new construction must be approved by BROWARD COUNTY ePERMITS FIRST, THEN submitted to Sunrise Community Development for exterior changes, THEN to Building Division. Three-step routing. Contractor registrations expire SEPTEMBER 30TH every year — NOT on the anniversary of registration. Must re-register before Oct 1 or cannot pull permits.

Check your Sunrise package.

Upload your documents and see what is missing before you submit.

Start Free Analysis →

3 free analyses to start. No credit card needed.

Free
$0
3 analyses to start
Pro
$49/mo
20 analyses/month
Unlimited
$149/mo
Unlimited analyses
Single
$15.99
One time
Nearby cities
All Broward County cities →