Sunrise Permit Requirements

Your documents checked against 261 city-specific requirements. Missing items, gotchas, and compliance score — in seconds.

Check Your Package →
17
Types
261
Items
24
Gotchas
Building Department
Address
10770 W. Oakland Park Boulevard, Sunrise, FL 33351
Hours
Mon–Thu 8:00 AM to 5:00 PM, Fri 8:00 AM to 4:00 PM
Submission
e-Plan Review online + in-person; SIGNED ZONING CHECKLIST REQUIRED — applications rejected without it
NOC Threshold
$5000 — required above this amount
Plan Sets
2
Wind Zone
HVHZ — Miami-Dade NOA or FL# required for all exterior products
Sunrise Permit Portal →
Requirements by Trade
General / Structural3

General Construction / Building Permit — City of Sunrise

54
  • Hours: Mon–Thu 8 AM – 5 PM, Fri 8 AM – 4 PM
  • Professional Day: Every Wednesday 8 AM – Noon (Plans Examiners available for walk-in Q&A)
  • Sunrise Building Permit Application Cover Sheet — SUNRISE-SPECIFIC city cover sheet required
  • + 51 more

Screen Enclosure Permit — City of Sunrise

15
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Product Approvals (NOAs) for screen enclosure system
  • Plans and survey
  • Contractor license and insurance
  • + 11 more

Demolition Permit — City of Sunrise

8
  • City of Sunrise applicable Addendums
  • Broward County Asbestos Renovation or Demolition Form (SRRA) — REQUIRED
  • Two (2) sets of plans/scope of work
  • Survey
  • + 4 more
Roofing1

Roof / Re-Roof Permit — City of Sunrise

17
  • Two (2) sets of complete HVHZ uniform roofing permit application form and all attachments
  • HVHZ Required Owners Notification for Roofing Considerations — owner initials required
  • + 15 more
Electrical2

Electrical Permit — City of Sunrise

21
  • Sunrise Building Permit Application Cover Sheet
  • Building Permit Addendum — Electrical (SUNRISE-SPECIFIC)
  • Two (2) sets of plans signed and sealed — or notarized by Electrical Contractor qualifier
  • Product Approvals (NOAs) as applicable
  • + 17 more

Generator Permit — City of Sunrise

6
  • Broward County Uniform Building Permit Application + City of Sunrise Electrical Addendum
  • Product approvals
  • Plans showing installation location and details
  • Generator (residential) fee: $333.66 total ($111.22 app + $222.44 remaining)
  • + 2 more
Plumbing1

Plumbing Permit — City of Sunrise

19
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application (Plumbing checked)
  • Building Permit Addendum — Plumbing (SUNRISE-SPECIFIC)
  • Two (2) sets of plans (signed and sealed when required by code)
  • + 15 more
Mechanical / HVAC1

Mechanical / AC Permit — City of Sunrise

16
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application (Mechanical checked)
  • Building Permit Addendum — Mechanical (SUNRISE-SPECIFIC)
  • Contractor license and insurance (current) — registrations expire Sept 30 annually
  • + 12 more
Windows & Doors1

Windows & Doors / Shutters Permit — City of Sunrise

10
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Product Approvals (NOAs) — required for ALL window, door, and shutter products in HVHZ
  • Broward County Retrofit Window and Door Schedule — available from Document Central
  • Broward County Fenestration Wind Load Chart — available from Document Central
  • + 6 more
Pool & Spa1

Pool / Spa / Fountain Permit — City of Sunrise

18
  • City of Sunrise Structural Addendum
  • Pool plans designed by FL registered Architect or Professional Engineer
  • + 16 more
Fence & Driveway2

Fence Permit — City of Sunrise

23
  • Completed Homeowner Affidavit
  • Two (2) copies of boundary survey or site plan indicating fence location and dimensions
  • Mark each run of fence with X's, label each run with length, indicate gate locations and sizes
  • State if pool and/or spa is on property
  • + 19 more

Shed Permit — City of Sunrise

12
  • Broward County Uniform Building Permit Application + City of Sunrise Structural Addendum
  • Plans and product approvals as applicable
  • Survey showing proposed location
  • Contractor license and insurance
  • + 8 more
Marine / Waterfront1

Dock Permit — City of Sunrise

14
  • Sunrise Building Permit Application Cover Sheet
  • Broward County Uniform Building Permit Application + Structural Addendum
  • Signed and sealed plans + calculations by FL licensed Architect/Engineer
  • Survey — current, signed and sealed, showing existing conditions
  • + 10 more
Fire & Safety1

Fire Suppression / Alarm Permit — City of Sunrise

7
  • Broward County Uniform Building Permit Application + City of Sunrise Fire Addendum
  • Fire sprinkler/alarm drawings — signed and sealed sprinkler drawing and hydraulic calcs
  • Cut sheets for ALL components used
  • Fire suppression system fee: $337.93 total ($112.64 app + $225.29 remaining)
  • + 3 more
Signs1

Sign Permit — City of Sunrise

8
  • Broward County Uniform Building Permit Application + applicable addendums
  • Product Approvals (NOAs) for sign structure
  • Plans (signed and sealed for monument signs)
  • Contractor license and insurance
  • + 4 more
Business & Admin2

Private Provider — City of Sunrise

7
  • Notice to Building Official of Use of Private Provider — Form # 61G20-2.005-2002-01 (effective January 1, 2025)
  • Services: Plans Review, Inspections, or both
  • Must include: qualification statements/resumes + certificate of insurance per s. 553.791(18)
  • + 4 more

Change of Contractor — City of Sunrise

6
  • City of Sunrise Hold Harmless/Indemnity Letter — available in Document Central
  • Form must be completely filled out, signed, and NOTARIZED
  • New Broward County Uniform Building Permit Application + City of Sunrise Addendum
  • Amended Notice of Commencement
  • + 2 more

Common Rejection Reasons

8 documented for Sunrise. Our AI flags all of these.

1Signed Zoning Checklist is REQUIRED with every permit application — applications are rejected without it. This is a SUNRISE-SPECIFIC requirement not found in other Broward cities.
2Demos, additions, alterations, and new construction must be approved by BROWARD COUNTY ePERMITS FIRST, THEN submitted to Sunrise Community Development for exterior changes, THEN to Building Division. Three-step routing.
3Contractor registrations expire SEPTEMBER 30TH every year — NOT on the anniversary of registration. Must re-register before Oct 1 or cannot pull permits.
4Insurance certificate holder must read EXACTLY 'City of Sunrise, 10770 W. Oakland Park Boulevard, Sunrise, FL 33351' — any variation (wrong street format, missing city name) will delay registration.
5Qualifier's government-issued photo ID is required for contractor registration — most cities don't require this. Missing ID = registration rejected.
6Contractor Registration form must be NOTARIZED by the qualifying agent — unsigned or un-notarized forms rejected.
7Owner Builder Affidavit MUST be signed IN PERSON at the Building Division and notarized by a City of Sunrise Permit Service Specialist. Cannot be done remotely, even for electronic submittals.
8NOC threshold discrepancy — Alliance page and some older forms say $2,500 but current F.S. 713.13 (eff. 7/1/2024) sets threshold at $5,000. Newer 2025 checklists reflect $5,000. Use $5,000.
What You Get

Sample analysis for a Sunrise roofing permit:

Analysis Complete
Sunrise · Roofing
73%
Compliance
×Roof Material WorksheetMissing
×Product Approval (NOA)Missing
Signed & Sealed PlansFound
Permit ApplicationFound
Notice of CommencementFound
Product approvals must show FL# or Miami-Dade NOA — generic spec sheets will be rejected.
Try With Your Docs →
Free
$0
1/month
Pro
$29/mo
30/month
Single
$15.99
One-time
FAQ
What documents do I need for a permit in Sunrise?

Typical requirements: completed application, signed & sealed plans, site survey, product approvals (Miami-Dade NOA or FL# since Sunrise is HVHZ), energy calcs for HVAC, and NOC if job exceeds $5000. Our AI checks against all 261 Sunrise-specific items.

How do I submit a permit in Sunrise?

e-Plan Review online + in-person; SIGNED ZONING CHECKLIST REQUIRED — applications rejected without it Portal: Sunrise online system. Phone: 954-572-2354

What causes rejections in Sunrise?

Top reasons from our 24 documented gotchas: Signed Zoning Checklist is REQUIRED with every permit application — applications are rejected withou... Our AI flags all 24 automatically.