23 checklist items for solar panel applications in Davie. Click an item to check it off as you gather your documents.
Check Your Package Free →Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Davie building department whether it is due at application or before the first inspection.
2 paper sets if submitting paper plans, or submit electronically via OAS/ProjectDox.
Yes. Davie is in the HVHZ, which affects product approval and wind load requirements.
Solar contractors CANNOT install the electrical portion — a separate licensed electrical contractor is required. Electrical contractors CAN install both solar panels and electrical portion. Special Inspector Form required for any system with more than 1 panel — missing this will cause rejection.
Upload your documents and see what is missing against the Davie checklist.
Start Free Analysis →3 free analyses to start. No credit card needed.