Dania Beach Building Permit Requirements

51 checklist items for building applications in Dania Beach. Click an item to check it off as you gather your documents.

Check Your Package Free →
Phone
954-924-6805
Address
100 W Dania Beach Blvd, Dania Beach, FL 33004
Hours
Mon-Thu 8:30 AM - 3:30 PM, Fri drop box only
Portal
Submission
In-person Mon-Thu 8:30AM-3:30PM; Drop box Fri; ePermits online
Plan sets
2 sets
NOC threshold
$5,000 ($15,000 HVAC)
Wind zone
HVHZ (High Velocity)
Insurance certificate holder (exact wording)
City of Dania Beach
Building Permit checklist for Dania Beach
Requirements change. Confirm the current checklist with the Dania Beach building department before you submit. See every permit type on the Dania Beach permit requirements page.
Frequently asked questions
Where do I submit a permit application in Dania Beach?

In-person Mon-Thu 8:30AM-3:30PM; Drop box Fri; ePermits online. Portal: https://esuite-daniabeach-fl.tylertech.com.

What insurance certificate holder wording does Dania Beach require?

The certificate holder should read: City of Dania Beach

Do I need a Notice of Commencement in Dania Beach?

Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Dania Beach building department whether it is due at application or before the first inspection.

How many plan sets does Dania Beach require?

2 sets listed. This can vary by permit type, so confirm with the building department.

Is Dania Beach in the High Velocity Hurricane Zone (HVHZ)?

Yes. Dania Beach is in the HVHZ, which affects product approval and wind load requirements.

What gets a building application rejected in Dania Beach?

Incomplete applications will NOT be processed — verify ALL items before submission. Plans will NOT be returned for corrections — new plan sheets must be submitted to Permitting Department. NOC timing is disputed between sources — GFL Alliance says 'prior to submittal,' FAQ says 'prior to first inspection,' checklist says 'at pick-up.' SAFEST: submit recorded NOC with application.

Check your building package.

Upload your documents and see what is missing against the Dania Beach checklist.

Start Free Analysis →

3 free analyses to start. No credit card needed.