Miami Permit Requirements

We check your documents against every Miami-specific requirement. Instantly.

0
Permit Types
0
Requirements
0
Gotchas
Check Your Miami Package →

Building Department

Address
444 SW 2nd Ave, 4th Floor, Miami, FL 33130
Submission
FULLY DIGITAL — ALL applications via iBuild; plans via ProjectDox/ePlan. NO PAPER APPLICATIONS.
NOC Threshold
$5000 — NOC required above this amount
Plan Sets
2 set(s) required
Wind Zone
HVHZ — All exterior products need Miami-Dade NOA or FL# approval
Open Miami Permit Portal →

Permit Types by Trade

Click any trade to expand. These are the 230 requirements we check.

General / Structural3

Building Permit (New Construction / Additions / Alterations)

34
  • ALL applications via iBuild portal — 100% digital, no paper applications accepted
  • Plans uploaded through ePlan/ProjectDox — NOT through iBuild
  • Plans must be digitally signed and sealed by registered architect/engineer
  • Two (2) sets of plans required — site/plot plan, floor plan, elevations, cross sections, roof framing, energy calcs
  • + 30 more checked during analysis

Demolition Permit (Total or Partial)

11
  • ALL applications via iBuild portal — 100% digital
  • Demolition permits handled under Unsafe Structures section of Building Department
  • City + MDC Contractor Registration required
  • Lead environmental sampling may also be required — actual cost charged
  • + 7 more checked during analysis

Certificate of Occupancy (CO) / Certificate of Completion (CC)

10
  • CO required before occupancy of any new building or change of use
  • CC required for completion of permitted work on existing structures
  • CO fee: Residential $105/unit; Commercial $0.10/sq ft (min $250)
  • CC fee: Commercial min $150
  • + 6 more checked during analysis
Roofing1

Roofing Permit (Re-Roof — HVHZ)

19
  • ALL applications via iBuild portal — 100% digital
  • HVHZ Uniform Roofing Permit Application required for ALL re-roofs (FBC 8th Ed Chapter 15)
  • HVHZ Roofing Permit Forms Package required (complete package per FBC Section 1525)
  • Miami-Dade NOA (Notice of Acceptance) required for ALL roofing materials — every component
  • + 15 more checked during analysis
Electrical3

Solar Panel Installation Permit

12
  • ALL applications via iBuild portal — 100% digital
  • Solar permits processed within 3 BUSINESS DAYS per City ordinance
  • NOTE: Fee waiver does NOT include surcharges required by federal, state, or county governments
  • Solar PV Permit Application required
  • + 8 more checked during analysis

Electrical Permit (Panel / Service / Trade)

11
  • ALL applications via iBuild portal — 100% digital
  • MDC Electrical Fee Sheet required with application
  • City + MDC Contractor Registration required (dual registration)
  • Notice of Commencement required if job value >= $5,000; $15,000 for A/C
  • + 7 more checked during analysis

EV Charger Installation Permit

7
  • ALL applications via iBuild portal — 100% digital
  • Electrical permit required for EV charger installation
  • Product Approvals for charger equipment
  • Electrical plans showing charger location, circuit details, panel capacity
  • + 3 more checked during analysis
Plumbing1

Plumbing Permit (General / Trade)

7
  • ALL applications via iBuild portal — 100% digital
  • MDC Plumbing and Gas Fee Sheet required with application
  • City + MDC Contractor Registration required (dual registration)
  • Notice of Commencement required if job value >= $5,000
  • + 3 more checked during analysis
Mechanical / HVAC1

Mechanical/HVAC Permit (A/C Replacement / Trade)

11
  • ALL applications via iBuild portal — 100% digital
  • MDC Mechanical Fee Sheet required with application
  • City + MDC Contractor Registration required (dual registration)
  • Notice of Commencement required if job value >= $15,000 for A/C replacements (HIGHER threshold)
  • + 7 more checked during analysis
Windows & Doors1

Windows / Doors / Shutters Permit

10
  • ALL applications via iBuild portal — 100% digital
  • Windows/doors qualify for WALK-THRU same-day structural review at Building Department
  • Window and Door Schedule required
  • Product Approvals (MDC NOA) required with wind load calculations (HVHZ — 175 mph)
  • + 6 more checked during analysis
Pool & Spa1

Pool / Spa Permit

10
  • ALL applications via iBuild portal — 100% digital
  • Pool permits qualify for walk-thru same-day structural review at Building Department
  • Plans showing pool location, dimensions, setbacks, barriers, equipment, plumbing/electrical
  • Product Approvals (MDC NOA) required for pool barrier and safety equipment (HVHZ)
  • + 6 more checked during analysis
Fence & Driveway3

Fence Permit

13
  • ALL applications via iBuild portal — 100% digital
  • Fence permits qualify for WALK-THRU same-day structural review at Building Department
  • City provides Standard Detail drawings for Masonry, Metal, and Wood fences — use these to streamline
  • Standard Detail Masonry Fence PDF available on forms page
  • + 9 more checked during analysis

Driveway Permit

9
  • ALL applications via iBuild portal — 100% digital
  • Driveways qualify for WALK-THRU same-day structural review at Building Department
  • Site plan showing driveway location, dimensions, setbacks to property lines
  • Miami 21 zoning code specifies maximum driveway width, setbacks, and coverage
  • + 5 more checked during analysis

Shed / Accessory Structure Permit

9
  • ALL applications via iBuild portal — 100% digital
  • Plans showing shed location, dimensions, setbacks per Miami 21 zoning
  • Product Approvals (MDC NOA) required for pre-fabricated sheds (HVHZ)
  • Signed/sealed plans required for site-built sheds over certain size
  • + 5 more checked during analysis
Marine / Waterfront2

Dock / Marine Structure Permit

12
  • City of Miami has SIGNIFICANT waterfront: Biscayne Bay, Miami River, canals
  • City building permit via iBuild for structural components
  • MDC DERM Class I Permit Application required for ALL dock/seawall/mangrove work in tidal waters
  • MDC DERM Class I applications submittable ONLINE as of December 1, 2025
  • + 8 more checked during analysis

Seawall Permit

5
  • Same requirements as dock/marine permit — see dock permit type
  • DUAL PERMIT: City building permit + MDC DERM Class I
  • Engineering plans showing seawall design, tiebacks, drainage
  • Geotechnical report may be required
  • + 1 more checked during analysis
Fire & Safety1

Fire Alarm / Sprinkler Permit (Standalone)

9
  • ALL applications via iBuild portal — 100% digital
  • Standalone Fire Alarm or Sprinkler Permit available (separate from Master Permit)
  • Fire alarm plans showing device locations, wiring, annunciation
  • Sprinkler plans showing pipe sizing, head locations, flow calculations
  • + 5 more checked during analysis
Signs1

Sign Permit

10
  • ALL applications via iBuild portal — 100% digital
  • City of Miami Sign Code applies — separate from FBC
  • Sign Code Design Standards available on miami.gov
  • Certain signs are exempt from permit — check exemption list
  • + 6 more checked during analysis
Business & Admin2

Private Provider Program

7
  • Private Provider option per F.S. 553.791
  • Must be licensed engineer (FL Ch. 471) or architect (FL Ch. 481)
  • Fee credit: 1/3 of permit fee when using BOTH plan review and inspections
  • Fee credit: 1/6 of permit fee when using only plan review OR only inspections
  • + 3 more checked during analysis

Change of Contractor / Architect / Engineer

5
  • Fee: $100 per change
  • Submit through iBuild — Add/Update Contractor on Building Permit
  • New contractor must be registered with City of Miami (Ordinance 14279) + MDC
  • New contractor's insurance must name 'City of Miami Building Department' as certificate holder
  • + 1 more checked during analysis

Common Rejection Reasons

Top 8 reasons permits get rejected in Miami.

1
ALL permit applications are 100% DIGITAL via iBuild — NO paper applications accepted
2
Plans must be uploaded through ePlan/ProjectDox — NOT submitted through iBuild directly
3
Plans must be digitally signed and sealed — printed copies are NOT considered signed and sealed
4
Standard naming convention REQUIRED for drawings and documents uploaded to ProjectDox
5
Insurance certificates must be sent DIRECTLY from the insurance provider to eplanbuilding@miamigov.com — contractor cannot forward them
6
Insurance certificate must name 'City of Miami Building Department' as certificate holder — NOT just 'City of Miami'
7
DUAL REGISTRATION REQUIRED — must register with BOTH City of Miami (Ordinance 14279, FREE, 2-3 days) AND Miami-Dade County
8
Contractor registration requires: State License (DBPR), Business Tax Receipt/Local Business Tax Receipt (LBT), Driver's License, EIN, Company info + Liability COI + Workers Comp COI

See What You Get

This is what a Flo Permit analysis looks like:

Analysis Complete
Miami · Roofing Permit
73%
Compliance
×Roof Material WorksheetMissing
×Product Approval (FL# or NOA)Missing
Signed & Sealed PlansFound
Permit ApplicationFound
Notice of CommencementFound
Product approvals must show FL approval number or Miami-Dade NOA — generic spec sheets will be rejected.
Try With Your Documents →
Free
$0
1 analysis/month
Pro
$29/mo
30 analyses/month
Single
$15.99
One-time analysis

FAQ — Miami

What documents do I need for a permit in Miami?

For most permits: completed application, signed & sealed plans, site survey, product approvals (Miami-Dade NOA or FL# required since Miami is HVHZ), energy calculations for HVAC, and Notice of Commencement if your job exceeds $5000. Our AI checks your package against all 230 Miami-specific requirements and shows you exactly what's missing.

How do I submit a permit in Miami?

FULLY DIGITAL — ALL applications via iBuild; plans via ProjectDox/ePlan. NO PAPER APPLICATIONS. Access the portal: Miami online permitting system. Phone: 305-416-1100

What are the most common reasons permits get rejected in Miami?

Based on 58 documented gotchas: ALL permit applications are 100% DIGITAL via iBuild — NO paper applications accepted... Our AI automatically flags all 58 known rejection triggers for Miami before you submit.

Is Miami in the HVHZ?

Yes — Miami is in a High Velocity Hurricane Zone. Every exterior product (windows, doors, roofing, shutters) must have a Miami-Dade NOA or Florida Product Approval with FL# number. Standard ICC-ES reports or generic spec sheets are NOT accepted. Our AI verifies product approval documentation automatically.