26 checklist items for electrical applications in Lighthouse Point. Click an item to check it off as you gather your documents.
Check Your Package Free →Online or in person - NO FAXED applications.
Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Lighthouse Point building department whether it is due at application or before the first inspection.
2 sets listed. This can vary by permit type, so confirm with the building department.
Yes. Lighthouse Point is in the HVHZ, which affects product approval and wind load requirements.
ALL electrical work MUST be done by licensed contractor — NO owner/builder permitted. Service change involving FPL disconnect/reconnect requires Service Procedure Form. On day of inspection — DO NOT proceed with disconnection without first speaking to inspector VOICE ONLY (not text, not email) to confirm inspection is scheduled.
Upload your documents and see what is missing against the Lighthouse Point checklist.
Start Free Analysis →3 free analyses to start. No credit card needed.