12 checklist items for electrical service change applications in Wilton Manors. Click an item to check it off as you gather your documents.
Check Your Package Free →100% Online via Citizenserve — ALL permits submitted electronically. Portal: https://www6.citizenserve.com/Portal/PortalController?Action=showHomePage&ctzPagePrefix=Portal_&installationID=125.
The certificate holder should read: City of Wilton Manors, 2020 Wilton Drive, Wilton Manors, FL 33305
Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Wilton Manors building department whether it is due at application or before the first inspection.
2 sets listed. This can vary by permit type, so confirm with the building department.
Yes. Wilton Manors is in the HVHZ, which affects product approval and wind load requirements.
Form requires 2 ground rods (5/8 x 8 feet), minimum 6 feet apart. All electrical equipment installed must be listed and labeled by approved testing laboratory.
Upload your documents and see what is missing against the Wilton Manors checklist.