Broward County

Pompano Beach Permit Requirements

Checklists for 25 permit types in Pompano Beach, plus 29 common rejection reasons. Check your own package against them in seconds.

Check Your Package Free →
25
Permit types
440
Requirements
29
Gotchas
Phone
954-786-4669
Address
100 West Atlantic Boulevard, 3rd Floor, Pompano Beach, FL 33060
Hours
Mon-Thu 7:00 AM - 6:00 PM (excluding holidays)
Portal
Submission
100% Electronic via ePlan - Applications must be in BLACK INK
Plan sets
1 set
NOC threshold
$5,000 ($15,000 HVAC)
Wind zone
HVHZ (High Velocity)
Insurance certificate holder (exact wording)
City of Pompano Beach, 100 W Atlantic Blvd, Pompano Beach, FL 33060
Requirements by permit type
General / Structural
4 types▼
Building Permit
49 items
  • Submit via Click2Gov portal to create application number, then upload documents to ePlan
  • All plans and supporting documents must be uploaded electronically in PDF format
  • In-person submittal accepted at 3rd floor counter — paper documents scanned into electronic system (scanning fees apply)
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) — BORA revision January 8, 2026 required
  • + 44 more requirements
View the full building checklist →
Demolition Permit
21 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (General checked) from licensed general contractor
  • Completed Broward County Uniform Permit Application (Plumbing checked) from licensed plumbing contractor
  • Completed Broward County Uniform Permit Application (Electrical checked) from licensed electrical contractor for removal of power or letter from FPL
  • + 16 more requirements
View the full demolition checklist →
Interior Buildout Permit
20 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed general contractor
  • Completed Broward County Uniform Permit Application (Other Box checked) for Floodplain from applicant
  • Completed Broward County Uniform Permit Application (Plumbing checked) from licensed plumbing contractor — separate application for gas if installed by different contractor
  • + 15 more requirements
View the full interior buildout checklist →
Certificate of Occupancy
8 items
  • CC/TCO/CO Submittal Form required — city-specific fillable form
  • All required inspections must be passed and closed out before CO issuance
  • All trade permits under the master permit must be finaled
  • All outside agency approvals must be received
  • Temporary Certificate of Occupancy or Partial CO: $550 per unit
  • + 3 more requirements
Roofing
1 types▼
Roofing Permit
23 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) by licensed roofing contractor or owner/builder — BORA revision January 8, 2026 required
  • Completed High Velocity Hurricane Zone (HVHZ) Uniform Permit Application with ALL required attachments
  • Completed Fire Review Application — required for multi-family, condominium, and commercial (not required for single-family residential)
  • + 18 more requirements
View the full roofing checklist →
Electrical
4 types▼
Electrical Permit
18 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Electrical checked) from licensed electrical contractor or owner/builder
  • Submit separate applications for electrical, low voltage, and fire alarm service scopes
  • Application signed by BOTH owner AND contractor, notarized
  • + 13 more requirements
View the full electrical checklist →
Solar Panel Permit
29 items
  • Submit via Click2Gov portal + ePlan document upload
  • NoteStandalone solar systems reviewed within 3 business days as part of Quick Service program
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Broward County Uniform Permit Application (Plumbing or Electrical checked) depending on system type
  • Broward County Uniform Permit Application (Building checked) for mounting panels
  • + 24 more requirements
View the full solar panel checklist →
EV Charger Permit
15 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed general contractor
  • Completed Broward County Uniform Permit Application (Electrical checked) from licensed electrical contractor
  • Completed Zoning Compliance Permit Application from licensed contractor
  • + 10 more requirements
View the full EV charger checklist →
Generator Permit
21 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Structural checked) from licensed structural contractor for structural elements
  • Completed Broward County Uniform Permit Application (Electrical checked) from licensed electrical contractor for connections and load calculations
  • Completed Broward County Uniform Permit Application (Plumbing checked) from licensed plumbing contractor for site plan and isometric riser for gas
  • + 16 more requirements
View the full generator checklist →
Plumbing
2 types▼
Plumbing Permit
12 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Plumbing checked) from licensed plumbing contractor or owner/builder
  • Application signed by BOTH owner AND contractor, notarized
  • Insurance certificate holder: City of Pompano Beach, 100 W Atlantic Blvd, Pompano Beach, FL 33060
  • + 7 more requirements
View the full plumbing checklist →
Water Heater Permit
17 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Standard water heater: Broward County Uniform Permit Application (Plumbing checked) from licensed plumbing contractor or owner/builder
  • Standard water heater: completed Broward County Dwelling Unit Water Heater Replacement Data Form
  • Standard water heater: cut sheets showing energy efficiency rating
  • + 12 more requirements
View the full water heater checklist →
Mechanical / HVAC
1 types▼
Mechanical / HVAC Permit
14 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Mechanical checked) from licensed mechanical contractor
  • For new installs, mini splits, or configuration/layout changes: also submit Building application (general contractor), Electrical application (electrical contractor), and Zoning Compliance application
  • AHRI Certificate of Product Ratings page for the A/C equipment being installed
  • + 9 more requirements
View the full mechanical / HVAC checklist →
Windows & Doors
1 types▼
Window & Door Permit
17 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed structural contractor or owner/builder
  • Completed Fire Review Application from licensed contractor (excludes single-family residences)
  • Owner/Builder Statement Affidavit if owner pulling own permit — not applicable for condominiums
  • + 12 more requirements
View the full window & door checklist →
Pool & Spa
1 types▼
Pool & Spa Permit
20 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Structural checked) from licensed swimming pool contractor — specify on application if deck and fence are included
  • Completed Broward County Uniform Permit Application (Plumbing checked) from licensed plumbing or swimming pool contractor
  • Completed Broward County Uniform Permit Application (Electrical checked) from licensed electrical contractor
  • + 15 more requirements
View the full pool & spa checklist →
Fence, Driveway & Structures
3 types▼
Fence Permit
16 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed structural contractor or owner/builder
  • Completed Zoning Compliance Permit Application from licensed contractor
  • Owner/Builder Statement Affidavit if owner pulling own permit — not applicable for condominiums
  • + 11 more requirements
View the full fence checklist →
Residential Driveway / Patio Permit
19 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed structural contractor or owner/builder
  • Completed Engineering Permit Application from licensed contractor — check with contractor registration department (954-786-4633) to confirm licenses and insurances are current
  • NoteFor asphalt drives, walks, or patio within City Right-of-Way, include Engineer Detail Standards as required
  • + 14 more requirements
View the full residential driveway / patio checklist →
Shed Permit
14 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed general contractor or owner/builder
  • Completed Zoning Compliance Permit Application from licensed contractor
  • If electric will be installed in the storage shed: Broward County Uniform Permit Application (Electrical checked) from licensed electrical contractor or owner/builder with electrical plan and riser diagram
  • + 9 more requirements
View the full shed checklist →
Marine / Waterfront
2 types▼
Dock & Marine Permit
21 items
  • Submit via Click2Gov/ePlan plus counter
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed structural contractor or owner/builder
  • Completed Engineering Permit Application from licensed contractor — separate Pompano-specific requirement
  • GotchaElectrical permit is ALWAYS required for docks in Pompano — not conditional like other cities
  • + 16 more requirements
View the full dock & marine checklist →
Seawall Permit
15 items
  • Submit via Click2Gov/ePlan plus counter
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed General Contractor or Marine Contractor
  • Completed Engineering Permit Application from licensed contractor — this is a SEPARATE permit from the building permit
  • Broward County Environmental Resource General License — must be obtained BEFORE city submittal
  • + 10 more requirements
View the full seawall checklist →
Signs
1 types▼
Sign Permit
14 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Building checked) from licensed general or sign contractor
  • Completed Broward County Uniform Permit Application (Electrical checked) from licensed electrical contractor
  • Completed Zoning Compliance Permit Application from licensed contractor
  • + 9 more requirements
View the full sign checklist →
Business & Admin
5 types▼
Private Provider
16 items
  • Authorized under Florida Statute 553.791 — Alternative Plans Review and Inspections
  • One-time registration required with City of Pompano Beach Building Department BEFORE submitting any permit applications
  • Submit Private Provider Registration Form to Building@copbfl.com for review and approval
  • Registration must be approved in advance to verify state licensure, insurance, and authorized representatives
  • Qualifies: Florida-licensed architects or engineers, or BCAIB-certified plans examiners or inspectors, and their listed Duly Authorized Representatives (DARs)
  • + 11 more requirements
View the full private provider checklist →
Business Tax Receipt
6 items
  • BTR required for businesses operating within Pompano Beach city limits
  • Submit to BusinessTaxReceipt@copbfl.com
  • Contractors must submit: Contractor Maintenance Form, proof of state or county license, Workers Compensation Insurance, General Liability Insurance
  • Per HB 735: license-exempt contractor categories (flooring, tree trimming, sealcoating, striping, sign erection, paver installation) now provide BTR number instead of contractor license on permit applications
  • Pompano Beach BTR required only for businesses based within city limits — BTR from another jurisdiction acceptable for outside businesses
  • + 1 more requirements
Change of Contractor
5 items
  • Change of contractor fee: $100
  • Submit completed Change of Contractor application
  • New contractor must be registered with City of Pompano Beach
  • New contractor license, Workers Comp, and General Liability must be current and on file
  • Insurance certificate holder: City of Pompano Beach, 100 W Atlantic Blvd, Pompano Beach, FL 33060
Special Event Permit
5 items
  • Temporary structures at events (tents, stages, temporary power) require standard building, electrical, and fire review permits
  • Fire Review Application required for events with structures, tents, or cooking operations
  • Electrical permit required for temporary power installations
  • Insurance certificate holder: City of Pompano Beach, 100 W Atlantic Blvd, Pompano Beach, FL 33060
  • For events on city property, contact Parks, Recreation and Cultural Arts Department at 954-786-4111
Kitchen & Bath Remodel Permit
25 items
  • Submit via Click2Gov portal + ePlan document upload
  • GotchaApplications MUST be in BLACK INK — will be rejected otherwise
  • Completed Broward County Uniform Permit Application (Structural checked) from licensed structural contractor
  • Completed Broward County Uniform Permit Application (Plumbing checked) from licensed plumbing contractor
  • Completed Broward County Uniform Permit Application (Electrical checked) from licensed electrical contractor
  • + 20 more requirements
View the full kitchen & bath remodel checklist →
Requirements change. Confirm the current checklist with the Pompano Beach building department before you submit.

Common rejection reasons in Pompano Beach

29 documented. Our analysis checks your package against these.

1Applications MUST be in BLACK INK - will be rejected otherwise
2Fire Review Application required for multi-family/condo/commercial — NOT required for single-family residential
3Broward County EPD must be approved BEFORE city submittal — submitting without EPD = rejection
4Both owner AND contractor signatures required, notarized — missing either = rejection
5Required when the direct contract is greater than $5,000 ($15,000 for repair or replacement of an existing HVAC system), per Fla. Stat. 713.135. Some older city forms list lower figures. Confirm timing with the building department.
6New/relocated electrical service must be UNDERGROUND per City Ordinance 152.07
7Emergency A/C repairs: notify Chief Mechanical Inspector (Scott.Maxwell@copbfl.com) with job address BEFORE starting — submit permit next business day
8Work without permit = DOUBLE the standard permit fee
9Dock extension limit: 10% of waterway width OR 8 feet (whichever is less) — stricter than Fort Lauderdale
10Boat lift extension: 20% of waterway width OR 20 feet (whichever is less)
11Engineering permits: 4% of construction cost (minimum $100)
12Broward County Uniform Permit Application (BORA revision January 8, 2026) required — previous versions rejected after March 9, 2026
13New application must indicate Private Provider status — if Yes, include Notice to Building Official (Form 61G20-2.005-2002.01)
14License-exempt contractors per HB 735 (flooring, tree trimming, sealcoating, striping, sign erection, paver installation) use BTR number instead of contractor license
15Private Provider one-time registration required before first permit — submit to Building@copbfl.com
16If Private Provider performs plan review, SAME provider must perform inspections — cannot split
17Click2Gov and ePlan are SEPARATE systems with SEPARATE login credentials
18Owner/Builder is NOT applicable for work in condominiums
19Owner/Builders NOT permitted for asphalt installation or removal (driveway/patio)
20Generator exhaust must be 10 feet from any building opening
21Pool final inspection will NOT be approved without FL Statute 515 barrier compliance
22TCO/Partial CO fee: $550 per unit (same for renewal/extension)
23Kitchen/bath 2nd floor+ condo: minimum STC 50 dB and IIC 50 dB sound barrier required
24Demolition requires TECO Gas clearance letter AND FPL power disconnect letter
25Standalone solar systems eligible for Quick Service (3 business day review)
26Reinspection fee: $60 first disapproval, $250 additional disapprovals
27Overtime inspections: $225 first 3 hours + $75/additional hour per inspector
28Plan revision fee: $100 per revision; additional work on revised plans at 4% of construction cost
29Re-inspection for wrong address or work not ready: 4x the first re-inspection fee
Frequently asked questions
Where do I submit a permit application in Pompano Beach?

100% Electronic via ePlan - Applications must be in BLACK INK. Portal: https://c2g.pompanobeachfl.gov/Click2GovBP/.

What insurance certificate holder wording does Pompano Beach require?

The certificate holder should read: City of Pompano Beach, 100 W Atlantic Blvd, Pompano Beach, FL 33060

Do I need a Notice of Commencement in Pompano Beach?

Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Pompano Beach building department whether it is due at application or before the first inspection.

How many plan sets does Pompano Beach require?

1 set listed. This can vary by permit type, so confirm with the building department.

Is Pompano Beach in the High Velocity Hurricane Zone (HVHZ)?

Yes. Pompano Beach is in the HVHZ, which affects product approval and wind load requirements.

What are common reasons permits get rejected in Pompano Beach?

Applications MUST be in BLACK INK - will be rejected otherwise. Fire Review Application required for multi-family/condo/commercial — NOT required for single-family residential. Broward County EPD must be approved BEFORE city submittal — submitting without EPD = rejection.

Check your Pompano Beach package.

Upload your documents and see what is missing before you submit.

Start Free Analysis →

3 free analyses to start. No credit card needed.

Free
$0
3 analyses to start
Pro
$49/mo
20 analyses/month
Unlimited
$149/mo
Unlimited analyses
Single
$15.99
One time
Nearby cities
All Broward County cities →