Miami-Dade County

Miami Beach Building Permit Requirements

61 checklist items for building applications in Miami Beach. Click an item to check it off as you gather your documents.

Check Your Package Free →
NOC threshold
$5,000 ($15,000 HVAC)
Building Permit checklist for Miami Beach
Requirements change. Confirm the current checklist with the Miami Beach building department before you submit. See every permit type on the Miami Beach permit requirements page.
Frequently asked questions
Do I need a Notice of Commencement in Miami Beach?

Florida law requires a recorded Notice of Commencement when the contract price is greater than $5,000 ($15,000 for repair or replacement of an existing heating or air conditioning system). Timing can vary, so confirm with the Miami Beach building department whether it is due at application or before the first inspection.

What gets a building application rejected in Miami Beach?

Two submission methods exist (walkthrough in-person vs electronic) — once started with one method, CANNOT switch to the other mid-process. Expired license/insurance in CSS system places HOLD on ALL permits — no inspections or new permits until updated. MDC County approval often required BEFORE Miami Beach plan review is complete.

Check your building package.

Upload your documents and see what is missing against the Miami Beach checklist.

Start Free Analysis →

3 free analyses to start. No credit card needed.

Other permit types in Miami Beach
All Miami Beach permit requirements →
Building Permit requirements in nearby cities